Interior Design at Upmanyu Group covers the full journey from empty shell to move-in ready — one design language, one execution team.
2-3 days
Understand how you live, take precise site measurements and confirm budget range.
10-15 days
Layouts, mood boards and photorealistic 3D visuals for every space, refined with you.
5-7 days
Finish samples, furniture selection and a detailed, itemised BOQ.
45-90 days
Civil work, false ceiling, electrical, carpentry, painting and furnishing, tracked on schedule.
3-5 days
Final styling, snag-list closure and a walkthrough before you move in.
Every material and brand named in your BOQ is what gets installed — checked at three stages of site inspection before sign-off.
Most 2-4 BHK homes take 60-90 days from material finalisation to handover, depending on scope and customisation.
Yes — every room is visualised in photorealistic 3D and approved by you before execution begins.
Yes, once the BOQ is signed off the price is fixed for the specified scope — any changes are quoted separately before work proceeds.
Yes, we regularly coordinate with existing consultants, though most clients prefer our single-team turnkey model.
All civil, carpentry and electrical work carries a 12-month defect-liability warranty from handover.
Concept design, layouts and approvals engineered for how you'll actually live or operate.
Learn moreFacades and elevations that set the tone before anyone steps inside.
Learn moreIndependent homes and villas built to structural, safety and finishing standards.
Learn moreShare your space and vision — we'll respond within one business day with next steps and an approximate estimate.
Our design team will reach out within one business day.